Call Us(510) 207-1387
Call Us(510) 207-1387
Home > Projects > Other Projects
The document provides tunnel engineers with an overall view of the field and also provides an appreciation of the diversity of problems that tunnel engineers must address. . .
Read MoreConstruction activities include all structural, roadway, electrical and mechanical work required for the following: Removal of the Cantilever Bridge Superstructure from approximately 125 meters west of Pier E3 center line to Pier E1; Removal of Pier E1 to approximately elevation 45 . . .
Read MoreThe Traffic Operations Center in Hawaii includes an underground Vehicle Turn-around at 40 ft below the surface, which was supported with a soil-nailed wall through the native sensitive Saprolite . . .
Read MoreThe Silicon Valley Rapid Transit (SVRT) Project will extend the San Francisco Bay Area Rapid Transit (BART) System south from Fremont to the cities of Milpitas, San Jose, and Santa Clara, California. . .
Read MoreASC provided engineering support to the Contractor, Miller/Watts Construction. The project was overseen by the U.S. Army Corps of Engineers and included construction of a . . .
Read MoreThe joint venture of Skanska-Shimmick-Herzog (SSH) was awarded the prestigious design-build contract for the Bay Area Rapid Transit’s (BART) extension to Berryessa, comprised of line, track, systems and stations. The project-wide noise and vibration monitoring was awarded through. . .
Read More