Other Projects

Home > Projects > Other Projects

Road Tunnel Design Guidelines – FHWA

The document provides tunnel engineers with an overall view of the field and also provides an appreciation of the diversity of problems that tunnel engineers must address. . .

Read More

Bay Bridge Demolition

Construction activities include all structural, roadway, electrical and mechanical work required for the following: Removal of the Cantilever Bridge Superstructure from approximately 125 meters west of Pier E3 center line to Pier E1; Removal of Pier E1 to approximately elevation 45 . . .

Read More

Hawaii H-3 Tunnels

The Traffic Operations Center in Hawaii includes an underground Vehicle Turn-around at 40 ft below the surface, which was supported with a soil-nailed wall through the native sensitive Saprolite . . .

Read More

BART Extensions to San Jose, Milpitas and Santa Clara

The Silicon Valley Rapid Transit (SVRT) Project will extend the San Francisco Bay Area Rapid Transit (BART) System south from Fremont to the cities of Milpitas, San Jose, and Santa Clara, California. . .

Read More

Guadalupe River Project

ASC provided engineering support to the Contractor, Miller/Watts Construction. The project was overseen by the U.S. Army Corps of Engineers and included construction of a . . .

Read More

BART to Berryessa

The joint venture of Skanska-Shimmick-Herzog (SSH) was awarded the prestigious design-build contract for the Bay Area Rapid Transit’s (BART) extension to Berryessa, comprised of line, track, systems and stations. The project-wide noise and vibration monitoring was awarded through. . .

Read More