F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT

20. EXAMPLE PROJECT KEY NUMBER.

(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F. for each project.)

21. TITLE AND LOCATION (CITY AND STATE)

BAY BRIDGE DEMOLITION PROJECT
SFOBB EAST SPAN DISMANTLING PROJECT

22. YEARS COMPLETED

PROFESSIONAL SERVICES

CONSTRUCTION (IF APPLICABLE)

2013 - Present

23. PROJECT OWNER’S INFORMATION

A.PROJECT OWNER

OWNER: CALTRANS;
PRIME JV: California Engineering /Silverado Contractors, JV

B. POINT OF CONTACT NAME

Scott Sandkohl

C. POINT OF CONTACT TELEPHONE NO.

(510) 207-1387

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (INCLUDE SCOPE, SIZE, AND COST)

Project Description and Scope:

Construction activities include all structural, roadway, electrical and mechanical work required for the following:

  • Removal of the Cantilever Bridge Superstructure from approximately 125 meters west of Pier E3 center line to Pier E1;
  • Removal of Pier E1 to approximately elevation 45;
  • Removal of Bypass Structure from Pier E1 to Bent 45A;
  • Completion of the Eastbound On-ramp, the bike path, the bike path landing and Southgate Road.

ASC serves as the Contractor’s Vibration Consultant, providing real-time vibration monitoring and suggesting mitigation measures, where applicable.

Construction Cost: Approximately $60 Million

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT

(1) Firm Name

Analysis & Solutions Consultants

(2) Firm Location (City and State)

San Francisco, CA

(3) Role

Vibration Monitoring