Presidio Parkway Project

Home > Services > Presidio Parkway Project

Presidio Parkway Project

F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT

20. EXAMPLE PROJECT KEY NUMBER.

(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F. for each project.)

21. TITLE AND LOCATION (CITY AND STATE)

PRESIDIO PARKWAY REPLACEMENT PROJECT
DOYLE DRIVE CONTRACT #3, SAN FRANCISCO, CA

22. YEARS COMPLETED

PROFESSIONAL SERVICES

CONSTRUCTION (IF APPLICABLE)

2009-2012

23. PROJECT OWNER’S INFORMATION

A.PROJECT OWNER

C.C. Myers, Inc

B. POINT OF CONTACT NAME

Gabe Farncroft; PM

C. POINT OF CONTACT TELEPHONE NO.

(510) 207-1387

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (INCLUDE SCOPE, SIZE, AND COST)

Project Description and Scope:

This $1.5 billion project will create a spectacular regional gateway between the iconic Golden Gate Bridge and the City of San Francisco. It has been designed to be context sensitive, and to improve access to the Presidio of San Francisco; it includes the unique features of a parkway, rather than a freeway.

All the Instrumentation and Monitoring of the construction and existing structures at the site are being provided with automated instrumentation linked to our Web-based Central Server.

ASC is providing the following services:

  • Pre-construction and Post-construction Surveys;;
  • Structural Health Monitoring of historical Presidio Trust Properties;
  • Noise Monitoring;
  • Vibration Monitoring;

We set up an alarming system that provides immediate notification of potential issues by mobile phone and email so problems can be addressed before they become critical

All data is safely stored and backed up on redundant and robust Central Servers.

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT

(1) Firm Name

Analysis & Solutions Consultants

(2) Firm Location (City and State)

San Francisco, CA

(3) Role

Noise & Vibration Control & Monitoring

Structural Health Monitoring

Pre- & Post-construction Surveys