Call Us(510) 207-1387
Call Us(510) 207-1387
Home > Services > Miscellaneous Projects
Dr. Oyenuga performed analysis as part of preliminary and detailed design of the elevated guideway transit system at San Francisco International Airport. The project also included the guideway for BART system as it enters the airport.
Route 238/580 Rehabilitation, Hayward; Route 880/262/Mission Project, Fremont; Route 87S (Bragh nam to Virginia), San Jose, San Francisco International Airport Upper Viaduct Renovation; Port of Oakland Terminal Expansion; Port of Oakland East Apron Reconstruction; NAS Lemore Concrete Apron Construction; LA Metro Red Line; Provo Canyon Tunnels, Utah; the Coleman Avenue Interchange project; and the IEC Tunnel Design Specification Manual. We wrote the Road Tunnel Design Guidelines for the FHWA!