Transbay Transit Center Project

Home > Services > Transbay Transit Center Project

Transbay Transit Center Project

F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT

20. EXAMPLE PROJECT KEY NUMBER.

(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F. for each project.)

21. TITLE AND LOCATION (CITY AND STATE)

TRANSBAY TRANSIT CENTER PROJECT
BEP CONTRACT TG-06, SAN FRANCISCO, CA

22. YEARS COMPLETED

PROFESSIONAL SERVICES

CONSTRUCTION (IF APPLICABLE)

2012-Present

23. PROJECT OWNER’S INFORMATION

A.PROJECT OWNER

Shimmick Construction, Inc

B. POINT OF CONTACT NAME

Ben Gordon; PM

C. POINT OF CONTACT TELEPHONE NO.

(510) 207-1387

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (INCLUDE SCOPE, SIZE, AND COST)

Project Description and Scope:

The Transbay Transit Center Project consists of the construction of a new four-story above-grade Transit Center, consisting of a grand hall, retail and office space, a bus plaza, an elevated bus deck, and a 5-acre roof-level park.

Two below-grade rail levels, servicing Caltrain and the future CA High-speed Rail system, will consist of a mixed-use concourse and train platforms.

On Contract TG06 – the $120 Million Below Grade Structural Concrete Substructure, Waterproofing, Mechanical, Electrical and Plumbing Package – construction involves: structural concrete foundations, reinforcement, embedded items, substructure construction, below-grade waterproofing, mechanical, electrical, and plumbing infrastructure.

The Contractor’s scheduled typical operations include the following:

  • Mat Pour
  • Sheer Walls/Knockout Walls
  • Walls / Columns (Lower)
  • Concourse Slab
  • Concourse Walls/Columns
  • Ramps
  • Other Walls

ASC’s Scope:

ASC is providing Noise & Vibration Monitoring for the project.

Total Project Cost: $4 Billion
Contract TG-06 Cost: $120 Million

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT

(1) Firm Name

Analysis & Solutions Consultants

(2) Firm Location (City and State)

San Francisco, CA

(3) Role

Noise & Vibration Control & Monitoring